Instant download after checkout. One price in Canadian dollars, paid once.

QUICKSAFETY COMPLIANCE
ISNetworld RAVS / Alberta / 2 pages

Electrical Utilities RAVS - Alberta

Electrical Utilities - Alberta RAVS: a 2-page Microsoft Word written safety program for ISNetworld, written for Alberta. It cites Alberta OH&S Code Part 40 and 1 more reference. It covers Safe Work Procedure, General Duties- Employer and General Duties-Employee. Add your company name, set the issue date and revision, and upload it. $9 CAD, instant download.

  • Alberta OH&S Code Part 40
  • Alberta Electrical Utility Code, 6th Edition
$9CAD, one program

Need more topics? The Alberta RAVS Library has all 76 titles for $299, about $3.93 a program.

  • 2 pages, 497 words, editable Microsoft Word (.docx)
  • Controlled header: initial issue date, revision #
  • Your company name and logo added free after checkout (Brand it)
  • Cites 2 references from Alberta OHS legislation
  • Instant download, re-download any time from your account

Prices in Canadian dollars. Tax calculated at checkout.

At a glance

The Electrical Utilities file, in numbers

Pages
2
Words
497
Sections
8
References cited
2
File
Microsoft Word .docx
Company name
Replace "COMPANY NAME"
Library
Alberta RAVS
Price
$9 CAD
Plain answer

What is the Electrical Utilities RAVS?

Contact with energised equipment or overhead lines causes shocks, burns and arc flash injuries. An electrical program covers isolation, safe limits of approach, qualified workers and the right tools and protective equipment.

This is the Electrical Utilities written program for contractors working on Alberta sites, written against the Alberta OHS Act, OHS Regulation and OHS Code. It is the document you upload for this topic when your client's ISNetworld account asks for it.

Who needs it: Electrical, utility and maintenance contractors, and any crew working near overhead lines.

Reviewer checklist

What ISNetworld reviewers look for

Reviewers read each program you upload against your client's requirements for your work type and province. These are the parts they look for in a electrical utilities program, and where this file covers each one.

  1. Limits of approach to energised equipment and power linesIn this file: "Safe Limits of Approach"
  2. Qualified workers and safe work practicesIn this file: "Safe Work Procedure", "General Duties-Qualified Employee"
  3. Tools, equipment and protective equipmentIn this file: "Personal Protective Equipment", "Working on Energised Equipment"
  4. Responsibilities of management, supervisors and workersIn this file: "General Duties- Employer", "General Duties-Employee", "General Duties-Qualified Employee"
  5. A controlled document with your company nameIn this file: header with initial issue date and revision #
  6. The legislation the program is built onIn this file: Alberta OH&S Code Part 40
What is inside

Every section of the Electrical Utilities program

The 8 section headings in the file, in order. Each one is written out in full and ready for your company name.

  1. Safe Work Procedure
  2. General Duties- Employer
  3. General Duties-Employee
  4. General Duties-Qualified Employee
  5. Personal Protective Equipment
  6. Safe Limits of Approach
  7. Working on Energised Equipment
  8. Aerial Device Controls
Legislation

The references this program cites

Printed in the file, so you and the reviewer can see exactly what each requirement rests on.

  • Alberta OH&S Code Part 40
  • Alberta Electrical Utility Code, 6th Edition

Read the current law: Occupational Health and Safety Act, SA 2020, c O-2.2; Occupational Health and Safety Code, Alta Reg 191/2021; Occupational Health and Safety Regulation, Alta Reg 184/2021.

Ready to upload

Uploaded today, in three steps

  1. Download and open it in WordThe file is ready the moment checkout completes. It opens in any current version of Microsoft Word.
  2. Make it yoursAdd your logo, replace "COMPANY NAME" with your company name in one find and replace, and fill in the initial issue date and revision #.
  3. Upload itRead it through, adjust anything that does not match how your crews work, and upload it to ISNetworld the same day.
Buy one, or the lot

Need more Alberta topics?

Clients rarely ask for one program. Every option downloads the moment you check out.

For ISNetworld contractors

Alberta Complete Program

$699$1,183 bought separatelySave $484
  • Your Alberta safety manual, any trade
  • Plus every Alberta RAVS title
  • Implementation Kit and 52 toolbox talks with the manual
Questions

Electrical Utilities RAVS, answered

What do I get with the Electrical Utilities RAVS?

One Microsoft Word document (.docx), 2 pages and 497 words, in 8 sections. You download it straight after checkout and can download it again from your account.

What do I change before I upload it?

Replace "COMPANY NAME" with your company name and fill in the initial issue date and revision number in the header. Then read it through and adjust anything that does not match how your crews work. Every word is editable.

Which legislation does it cite?

The file cites Alberta OH&S Code Part 40 and Alberta Electrical Utility Code, 6th Edition.

Can I get every Alberta title at once?

Yes. The Alberta RAVS Library includes all 76 titles for $299 CAD, against $684 bought one at a time. One download, every topic on hand for this client and the next one.

How do I get it ready for the ISNetworld review?

It arrives already written for its province or standard, with the references shown above printed in the file. Add your company name, fill in the issue date and revision, check it matches how your crews work and upload it. ISN's reviewers then grade it against your client's requirements for your work type.

Are you part of ISNetworld?

No. Quick Safety Compliance is not affiliated with or endorsed by ISN. ISNetworld and RAVS are ISN's names for its platform and its Review and Verification Services.

ISNetworld and RAVS are trademarks of ISN Software Corporation. Quick Safety Compliance is not affiliated with or endorsed by ISN. Prices in Canadian dollars; applicable tax added at checkout.