Instant download after checkout. One price in Canadian dollars, paid once.

QUICKSAFETY COMPLIANCE
Safe work practice / 12 pages

Ground Disturbance - Excavation Safe Work Practice

Ground Disturbance - Excavation safe work practice: a 12-page Microsoft Word document that tells your crew how to do this work safely. It covers Safety Meeting, Work Permit and Guarding. Not tied to one province, so it fits any Canadian workplace. Add your company name and use it today. $9 CAD, instant download.

$9CAD, one safe work practice
  • 12 pages, 3,574 words, editable Microsoft Word (.docx)
  • 27 sections, written out in full
  • Your company name and logo added free after checkout (Brand it)
  • Instant download, re-download any time from your account

Prices in Canadian dollars. Tax calculated at checkout.

At a glance

The Ground Disturbance - Excavation file, in numbers

Pages
12
Words
3,574
Sections
27
File
Microsoft Word .docx
Company name
Replace "COMPANY NAME"
Price
$9 CAD
Plain answer

What is the Ground Disturbance - Excavation safe work practice?

Striking a buried line or a trench collapse can kill. A ground disturbance and excavation program covers locates, hand exposure near facilities, sloping and shoring, and inspection of the excavation.

A safe work practice is the written "how we do this job safely" for one task or piece of equipment. This one is written for ground disturbance - excavation and is ready for your company name, so crews, supervisors and clients all read the same rules.

Who needs it: Civil, pipeline, utility and site preparation contractors.

What it covers

What a good ground disturbance - excavation safe work practice covers

  1. Locating and marking buried facilities before diggingIn this file: "Locating and Marking Facilities", "Locating Buried Facilities", "Exposing Buried Facilities - Hand Digging"
  2. Hand exposure and safe ground disturbance practicesIn this file: "Exposing Buried Facilities - Hand Digging", "Ground Disturbance Permit"
  3. Sloping, shoring and protective systemsIn this file: "Protecting Workers - Marking and guarding an Excavation", "Methods of Protection - Workers in Excavation", "Worker Entering Excavation - Proper Sloping, Shoring Bracing and Other"
  4. Inspection, access and supervisionIn this file: "Competent Workers", "Worker Access - Entering & Leaving Excavation - Ladders & Walkways", "Excavation Inspection"
  5. Purpose and scope: what the program covers and who it applies toIn this file: "Introduction"
  6. Training and competencyIn this file: "Competent Workers"
What is inside

Every section of the Ground Disturbance - Excavation safe work practice

The 27 section headings in the file, in order.

  1. Introduction
  2. Safety Meeting
  3. Work Permit
  4. Guarding
  5. Approvals
  6. Competent Workers
  7. Soil Stabilisation
  8. Soil Classification
  9. Protecting Workers - Marking and guarding an Excavation
  10. Methods of Protection - Workers in Excavation
  11. Worker Access - Entering & Leaving Excavation - Ladders & Walkways
  12. Locating and Marking Facilities
  13. Locating Buried Facilities
  14. Exposing Buried Facilities - Hand Digging
  15. Damaged Underground Facilities
  16. Worker Entering Excavation - Proper Sloping, Shoring Bracing and Other
  17. Safe Entry and Exit
  18. Cutting Back Walls
  19. Spoil Piles
  20. Water Hazards
  21. Backfill Operation
  22. Use of Mechanical Excavation Equipment
  23. Program Review
  24. Installing Shoring, Stingers or Braces
  25. Communication
  26. Ground Disturbance Permit
  27. Excavation Inspection
Need the whole program?

Ground Disturbance - Excavation is already inside 28 of our safety manuals

Each manual is the complete written program for one province and trade: its safe work practices, policies, procedures and fillable forms, plus an Implementation Kit and 52 toolbox talks, for $499.

Plus 16 more across 9 provinces and territories. See every manual.

Ready today

In use today, in three steps

  1. Download and open it in WordThe file is ready the moment checkout completes. It opens in any current version of Microsoft Word.
  2. Make it yoursAdd your logo, replace "COMPANY NAME" with your company name in one find and replace, and fill in the initial issue date and revision #.
  3. Put it to workRead it through, adjust anything that does not match how your crews work, and sign it off.

More safe work practices

All safe work practices
Questions

Ground Disturbance - Excavation, answered

What do I get with the Ground Disturbance - Excavation safe work practice?

One Microsoft Word document (.docx), 12 pages and 3,574 words, in 27 sections: Introduction, Safety Meeting, Work Permit, Guarding, Approvals and Competent Workers. You download it straight after checkout.

Is it written for my province?

Safe work practices describe how a task is done safely, so they are not tied to one province. Use it alongside your provincial safety program, and adjust any step to match your equipment and site rules.

How do I make it mine?

Replace "COMPANY NAME" with your company name, add your logo, and read it through with the crew that does the work. Every word is editable.

Is it included in your safety manuals?

Yes. Ground Disturbance - Excavation is one of the safe work practices inside 28 safety manuals, including the Construction, Electrical, Oil and Gas and Road Construction and Maintenance editions. If you need a complete program, the manual for your province and trade includes it along with the rest of the program, fillable forms, an Implementation Kit and toolbox talks.